CMHC : Solving Persistent Moisture Problems

Case Study: This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started showing symptoms of moisture damage.The symptoms appeared after the owners replaced the heating system boiler, installed a combustion air inlet in the boiler room, installed a new roof, sealed some air leakage and changed crawl space ventilation.


Full case study including causes and solution

© 2020 buildABILITY Corporation

  • Twitter - White Circle
  • LinkedIn - White Circle
  • YouTube - White Circle
  • Vimeo - White Circle

170 Sheppard Avenue East, Suite 202

North York, ON M2N 3A4

E: training@buildability.ca

T: 416-961-3487

F: 416-975-8819